Reversion Of The Trans-Isthmus Pipeline, Chiriqui – Bocas del Toro
The Trans-Isthmus Pipeline with an extend of 131 miles across the Isthmus of Panama, began operations in late 1982. The project consists in the Design and Construction of Civil Works, Electrical, Mechanical and Instrumentation works for Oil Pipeline Reversal. Client: Petroterminal de Panama.
-
Construction Of Atlantic And Pacific Tanks Farms
The project consists not only in the reversion of the pipeline, but also the widening of their storage facilities, with the construction of new tanks in both terminals. The project consists in Design and Construction of Civil Works, Electrical, Mechanical and Instrumentation for the construction of two tank farms.
-
PAC1 – Panama Canal Widening
Dry excavation of the North Pacific Approaching channel. The project consist in the removal, filling and disposal of more than eight million cubic meters of material from Paradise Hill and the construction of a new road to Borinquen. With this project began de expansion program of the Panama Canal.
-
Colinas de Pacora Integral Education Center
The project consists in the design and construction of aqueducts, sanitary and electrical systems, rainwater harvesting, paving, gardening areas, sports areas, green areas for school orchards, terraces and buildings with adaptations, as well as essential systems for the correct operation of classrooms, laboratories, administrative offices, dining rooms and gymnasium.
-
Straightening of the Gaillard Cut (ECG) Contractor – Escobal
The Contractor-Escobal project at the Panama Canal was part of the landslide stabilization projects at the Gaillard Cut or commonly known as Corte Culebra, has been one of the areas with more landslides in the Panama Canal and that has been stabilized with landslide stabilization works.
-
Sanitation Project For The City And Bay Of Panama
Is one of the of the Panama City Sanitation projects, which consists in placing pipes for sewage collection or drainage system, that will connected to the sanitary sewers of different houses and neighborhoods between Monte Oscuro and Rio Abajo. Therefore, sewage will no longer go adjacent rivers.
-
San Miguelito Sanitary Sewer
The project consists on the design and construction of the sanitary system. It contemplates the installation of 6 "pipe in ADS, 6" PVC pipe and 8 "pipe in ADS; approximately 23,000 m3 of rock excavation, 4,800 home connections, 813 inspection cameras and 24,000 ml of streets and sidewalks replacement.
Our Projects
Categories: