Our Projects

  • Urban Intervention of the Public Space of Vía Argentina

    Urban Intervention of the Public Space of Vía Argentina

    The activities include electrical works, duct beam and electric step boxes. Following, the installation of pluvial pipes and electric trays.  Works will be carried out at: Andrés Bello Park and Cabeza de Einstein Plaza.

  • Rehabilitation of La Arena – Pesé Road

    Rehabilitation of La Arena – Pesé Road

    The project consists of a 37.705 kilometers length. Throughout the project, 9 bridges will be built and 9,279m3 of selected material, 50,200 m3 of base base course and 66,311 ton of asphalt will be installed.

  • Reversion Of The Trans-Isthmus Pipeline, Chiriqui – Bocas del Toro

    Reversion Of The Trans-Isthmus Pipeline, Chiriqui – Bocas del Toro

    The Trans-Isthmus Pipeline with an extend of 131 miles across the Isthmus of Panama, began operations in late 1982.  The project consists in the Design and Construction of Civil Works, Electrical, Mechanical and Instrumentation works for Oil Pipeline Reversal. Client: Petroterminal de Panama.

  • Construction Of Atlantic And Pacific Tanks Farms

    Construction Of Atlantic And Pacific Tanks Farms

    The project consists not only in the reversion of the pipeline, but also the widening of their storage facilities, with the construction of new tanks in both terminals. The project consists in Design and Construction of Civil Works, Electrical, Mechanical and Instrumentation for the construction of two tank farms.

  • New Container Yard at Colon Container Terminal in the City of Colón

    New Container Yard at Colon Container Terminal in the City of Colón

    New Container Yard at Colon Container Terminal in the City of Colón

  • PAC1 – Panama Canal Widening

    PAC1 – Panama Canal Widening

    Dry excavation of the North Pacific Approaching channel. The project consist in the removal, filling and disposal of more than eight million cubic meters of material from Paradise Hill and the construction of a new road to Borinquen. With this project began de expansion program of the Panama Canal.

  • Colinas de Pacora Integral Education Center

    Colinas de Pacora Integral Education Center

    The project consists in the design and construction of aqueducts, sanitary and electrical systems, rainwater harvesting, paving, gardening areas, sports areas, green areas for school orchards, terraces and buildings with adaptations, as well as essential systems for the correct operation of classrooms, laboratories, administrative offices, dining rooms and gymnasium.

  • Straightening of the Gaillard Cut (ECG) Contractor – Escobal

    Straightening of the Gaillard Cut (ECG) Contractor – Escobal

    The Contractor-Escobal project at the Panama Canal was part of the landslide stabilization projects at the Gaillard Cut or commonly known as Corte Culebra, has been one of the areas with more landslides in the Panama Canal and that has been stabilized with landslide stabilization works.

  • Proyecto de Saneamiento de la Ciudad y la Bahía de Panamá

    Sanitation Project For The City And Bay Of Panama

    Is one of the of the Panama City Sanitation projects, which consists in placing pipes for sewage collection or drainage system, that will connected to the sanitary sewers of different houses and neighborhoods between Monte Oscuro and Rio Abajo. Therefore, sewage will no longer go adjacent rivers.

  • PESM(2)

    San Miguelito Sanitary Sewer

    The project consists on the design and construction of the sanitary system. It contemplates the installation of 6 "pipe in ADS, 6" PVC pipe and 8 "pipe in ADS; approximately 23,000 m3 of rock excavation, 4,800 home connections, 813 inspection cameras and 24,000 ml of streets and sidewalks replacement.

  • INFRASTRUCTURE FOR THE LOGISTICAL DEVELOPMENT

    INFRASTRUCTURE FOR THE LOGISTICAL DEVELOPMENT

    Infrastructure for the logistical development.

  • PEDA(1)

    C.P.A. Canglón – Yaviza

    The project consists on the design and rehabilitation of 53.48 km of roads and 420m of bridges located between Metetí / Canglón / Yaviza. 31,500 m3 of selected materials will be installed for the road, 155,000 m3 of base layer and 152,500 tons of asphaltic concrete.

  • Construction of Coastal Belt and New Roads

    Construction of Coastal Belt and New Roads

    Construction of viaducts toward the Coastal Belt in the City of Panama, in Paitilla and Plaza 5 de Mayo with Ave. 3 de Noviembre.

  • Canalización del Río Changuinola y Dragado del Río Berma

    Canalización del Río Changuinola y Dragado del Río Berma

  • round-02-02

    Balboa Harbor

    The project consists of the expansion of a container port in the Panama Canal Pacific Sector, the project area is 8 hectares and includes drainage works, reinforced concrete pavement communication and electricity viaducts and an electrical substation.